Cheepr
Games Simulation JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series
Simulation · ONGAKUKAN Co.,Ltd.

JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series

JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series
🖥 Windows
Positive · 86% of 22
DeveloperONGAKUKAN Co.,Ltd.
ControllerPartial
$22.99
Get deal →
Quality86/100
Excellent
  • 86% positive of 22 reviews
  • Small review sample — read with caution

Compare prices

Official store Best price
checked
steam, Official store, $22.99

Keyshops

No keyshop sources live yet.

Report a wrong price

About

京葉線は全線開業が1990年とJR東日本の中では比較的歴史の浅い路線で、東京都の千代田区と千葉県の千葉市を結ぶ路線です。東京駅~越中島駅間の地下区間を除き、全線に渡って東京湾沿いの高架線を走行しているのが特徴です。沿線は東京湾の埋め立て地として再開発が進んでおり、ニュータウンのほか、テーマパークや大型ショッピングモール、オフィスなどがそびえたっています。

The Keiyo Line, which opened in 1990, is a relatively young line within JR East, connecting Chiyoda-ku, Tokyo, with Chiba City, Chiba Prefecture. Except for the underground section between Tokyo Station and Etchujima Station, the entire line is characterized by running on elevated tracks along Tokyo Bay. The area along the line is being redeveloped as reclaimed land on Tokyo Bay, and in addition to new towns, theme parks, large shopping malls, and offices are towering above the area.A delta line (connecting line) is provided from Nishi Funabashi Station on the Musashino Line to Ichikawa Shiohama Station and Minami Funabashi Station on the Keiyo Line, and Musashino Line trains operate directly to the Keiyo Line.

Highlights

  • Shinminato Signal Station/Chibaminato Station - Inagekaigan Station
  • Gateway to Makuhari New City/Kaihimmakuhari Station
    Large shopping centers, office buildings, hotels and residences line the street. As an environmentally friendly "eco-sta." a small wind power generator has been installed on the platform.
  • Keiyo Railcar Center/Kaihimmakuhari Station - Shin-Narashino Station
    This is the main depot for the Keiyo and Musashino Lines. A new station, Makuharitoyosuna Station, is currently in operation near here.
  • Yatsu Higata/Shin-Narashino Station - Minami-Funabashi Station
    It can be seen on the left just before Minami-Funabashi Station.
  • Junction with Musashino Line/Minami-Funabashi Station - Futamatashimmachi Station
  • Junction with Musashino Line/Futamatashimmachi Station - Ichikawashiohama Station
  • Edogawa/Futamatashimmachi Station - Ichikawashiohama Station
    Crossing the railway bridge over the Edogawa River.
  • Chiba Port/Ichikawashiohama Station - Shin-Urayasu Station
    You will continue to the left of Chiba Port.
  • Factory area / Shin-Urayasu Station - Maihama Station
  • Gateway to a large theme park/Maihama Station
  • Old Edo River/Maihama Station - Kasai-Rinkai Park Station
    You will cross a railroad bridge over the Old Edo River.
  • Ferris wheel at Kasai-Rinkai Park/Maihama Station - Kasai-Rinkai Park Station
  • Arakawa River / Kasai-Rinkai Park Station - Shin-Kiba Station
    Crossing the railroad bridge over the Arakawa River.
  • Connecting line with Tokyo Waterfront Area Rapid Transit Rinkai Line/Kasai-Rinkai Park Station - Shin-Kiba Station
  • Sunamachi Canal / Shin-Kiba Station - Shiomi Station
    Cross the Sunamachi Canal while making a large right turn.
  • From the elevated section to the underground section / Shiomi Station - Etchujima Station

Route Information

  • Section: Keiyo Line Soga→Tokyo Going up
  • Total length: 43.0 km
  • Number of Stations: 17 *Data before the opening of Makuhari Toyosuna Station is included.
  • Security equipment: ATS-P

Train schedules that can be operated

  • Train Number: 780Y
  • Type/Destination: Local train bound for Tokyo
  • Station section that can be operated: Soga(07:17) to Tokyo(08:37)
  • Type of train: Series E233-5000 10 cars
  • Responsible for real voice train announcements: Soga train crew depot

  • Train Number: 1510Y
  • Type/Destination: Local train bound for Tokyo
  • Station section that can be operated: Soga(15:58) to Tokyo(16:46)
  • Type of train: Series E233-5000 10 cars
  • Responsible for real voice train announcements: Soga train crew depot
Review sentiment over time
positive critical

Media

JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 1
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 2
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 3
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 4
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 5
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 6
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 7
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 8
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 9
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 10
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 11
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 12
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 13
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 14
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 15
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 16
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 17
JR EAST Train Simulator: Keiyo Line (Soga to Tokyo) E233-5000 series screenshot 18

System requirements

System requirements platform
Minimum
Minimum:
  • Requires a 64-bit processor and operating system
  • OS: 64-bit Windows 11
  • Processor: Intel Core i5-8500 or AMD Ryzen 5 2600
  • Memory: 16 GB RAM
  • Graphics: NVIDIA GeForce GTX 1060 (VRAM 6GB)
  • DirectX: Version 12
  • Storage: 20 GB available space
  • Additional Notes: need resolution 1920×1080@60Hz
Recommended
Recommended:
  • Requires a 64-bit processor and operating system
  • OS: 64-bit Windows 11
  • Processor: Intel Core i5 12400 or AMD Ryzen 5 5500
  • Memory: 16 GB RAM
  • Graphics: NVIDIA GeForce RTX 3060 (VRAM 8GB)
  • DirectX: Version 12
  • Storage: 20 GB available space
  • Additional Notes: Recommended SSD
Minimum
Minimum:
    Recommended
    Recommended:
      Minimum
      Minimum:
        Recommended
        Recommended:

          Age rating & content

          dejusl
          steam_germany0

          Price history

          No price history recorded yet.

          Lowest prices

          No history yet.

          Game info

          Developer ONGAKUKAN Co.,Ltd.
          Publisher EAST JAPAN RAILWAY TRADING CO., LTD.
          Platforms Windows
          Compatibility
          Controller Partial
          Features
          Single-playerPartial Controller SupportFamily Sharing