Cheepr
Games Simulation JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series
Simulation · ONGAKUKAN Co.,Ltd.

JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series

JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series
🖥 Windows
Positive · 100% of 28
DeveloperONGAKUKAN Co.,Ltd.
ControllerPartial
$26.99
Get deal →
Quality100/100
Excellent
  • 100% positive of 28 reviews
  • Small review sample — read with caution

Compare prices

Official store Best price
checked
steam, Official store, $26.99

Keyshops

No keyshop sources live yet.

Report a wrong price

About

The 70.1 km route between Matsumoto Station and Minami-Kotani Station, which is under the jurisdiction of JR East, is well-known as a stop for customers visiting the mountain climbing and snow resort areas represented by Shinano-Omachi and Hakuba.

The Oito Line is a 105.4 km long line connecting Matsumoto Station in Nagano Prefecture to Itoigawa Station in Niigata Prefecture. The 70.1 km route between Matsumoto Station and Minami-Kotani Station, which is under the jurisdiction of JR East, is well-known as a stop for customers visiting the mountain climbing and snow resort areas represented by Shinano-Omachi and Hakuba. The "Super Azusa" limited express train runs directly from Shinjuku Station, and the line is also used as a commuter and school route in the Matsumoto area. From the driving scenery, you can experience the changing scenery of Shinshu from winter to spring with the magnificent snow-capped Northern Alps, cherry blossoms along the tracks, and rice paddies filled with water for the summer.

Highlights

  • Azusa River Railroad Bridge / Shimatakamatsu to Azusa Bridge
     Cross the Azusa River flowing from the Northern Alps.
  • Northern Alps / Azumi-Kutsugake~Shinano-Tokiwa
     You will enjoy the contrast between winter and spring with the snow-capped Northern Alps and beautifully blooming cherry blossoms.
    [Shinano-Omachi Station
     Shinano-Omachi Station is the gateway to the Tateyama-Kurobe Alpine Route, a mountain tourism route that runs through the Northern Alps to Toyama. The station, with its hut-like station building, rail bridge, and spacious interior, conveys the bustle of the area. 

Route information

  • Section: Oito Line Matsumoto→Minami-Otari Outbound
  • Total length: 70.1 km
  • Number of stations: 33
  • Safety equipment: ATS-Ps

Train schedules that can be operated

  • Train number: 5329M
  • Type/Destination: Local Train to Minami-Otari
  • Station section that can be operated: Matsumoto to Minami-Otari
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto Crew Supervisory Center

  • Train number: 3113M
  • Type/Destination: Local Train to Hotaka
  • Station section that can be operated: Matsumoto to Hotaka
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto Crew Supervisory Center

  • Train number: 3241M
  • Type/Destination: Local Train to Shinano-Omachi
  • Station section that can be operated: Matsumoto to Shinano-Omachi
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto Crew Supervisory Center
Review sentiment over time
positive critical

Media

JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 1
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 2
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 3
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 4
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 5
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 6
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 7
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 8
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 9
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 10
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 11
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 12
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 13
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 14
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 15
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 16
JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series screenshot 17

System requirements

System requirements platform
Minimum
Minimum:
  • Requires a 64-bit processor and operating system
  • OS: 64-bit Windows 11
  • Processor: Intel Core i5-8500 or AMD Ryzen 5 2600
  • Memory: 16 GB RAM
  • Graphics: NVIDIA GeForce GTX 1060 (VRAM 6GB)
  • DirectX: Version 12
  • Storage: 20 GB available space
  • Additional Notes: need resolution 1920×1080@60Hz
Recommended
Recommended:
  • Requires a 64-bit processor and operating system
  • OS: 64-bit Windows 11
  • Processor: Intel Core i5 12400 or AMD Ryzen 5 5500
  • Memory: 16 GB RAM
  • Graphics: NVIDIA GeForce RTX 3060 (VRAM 8GB)
  • DirectX: Version 12
  • Storage: 20 GB available space
  • Additional Notes: Recommended SSD
Minimum
Minimum:
    Recommended
    Recommended:
      Minimum
      Minimum:
        Recommended
        Recommended:

          Age rating & content

          dejusl

          Price history

          No price history recorded yet.

          Lowest prices

          No history yet.

          Game info

          Developer ONGAKUKAN Co.,Ltd.
          Publisher EAST JAPAN RAILWAY TRADING CO., LTD.
          Platforms Windows
          Compatibility
          Controller Partial
          Features
          Single-playerPartial Controller SupportFamily Sharing