Der Produkttext wird auf Englisch angezeigt, da kein Quelltext in dieser Sprache verfügbar ist.

PC 4,49 € Region DE
Spiele Action Agtnan: Monster Shutdown Sequence
Agtnan: Monster Shutdown Sequence: Titelbild
Action · AAGH Games, LLC

Agtnan: Monster Shutdown Sequence

Agtnan: Monster Shutdown Sequence
Windows
1 user reviews · 100% of 1
EntwicklerAAGH Games, LLC
GenreAction
Wait Price verdict · BE updated 7 days ago

The current price is 100% of the way from its all-time low to full price. Seasonal sales have priced it lower.

Why this verdict
Price position between all-time low and full price 100%
All-time low €4.04 · 11d ago
Player reviews 100% positive of 1
Quality score 100/100 · small sample
Value score 0/100

Angebote

Preise offizieller Shops und gekennzeichnete Keyshop-Vergleiche

Offizielle Shops (1)
Steam
geprüft 7 days ago Lowest price
Steam, offizieller Shop, €4.49
€4.49 Buy on Steam
Direct store link. Payment stays with the store.
Report a wrong price

About this game

What this game is, in the developer's words

Ready for a robot-battling adventure? Get your hands on Monster Shutdown Sequence and join the ultimate monster-fighting challenge. Experience classic 90s-inspired FPS arenas at your own pace, while mastering each map's danger and traps in order to survive the shutdown.

Non-stop sci-fi survival action


Take control of your robot's destiny in AGTNAN: Monster Shutdown Sequence! Featuring unique maps, themes, and mechanics, you'll need to be quick on your feet and use your wits to survive. Use explosive boxes, warp tubes, moving floors, portals and more to outsmart the enemy and make it to the end. Put those monsters in their place with the Monster Shutdown Sequence - an exciting adventure for robot-lovers of all ages!

Put your skills to the test and navigate through unique arenas full of intense action and thrilling challenges. Outlast waves of monsters with bombs, puzzles, and physics-based mechanics, while exploring fun and exciting theme maps. Experience classic 90s-inspired FPS arenas at your own pace, while mastering each map's danger and traps in order to survive the shutdown.

Take on the Monster Shutdown Challenge


• Take on each uniquely designed map with its own set of thrilling elements and obstacles.
• Fight back with powerful weaponry, including explosive boxes that spawn regularly.
• Improve your tech abilities with fallen enemies' Creds and unlock even more powerful features.
• Relive the golden age of arena FPS gaming with classic 90s visuals and mechanics.

Media

Trailers and screenshots straight from the store page

Agtnan: Monster Shutdown Sequence screenshot 1
Agtnan: Monster Shutdown Sequence screenshot 2
Agtnan: Monster Shutdown Sequence screenshot 3
Agtnan: Monster Shutdown Sequence screenshot 4
Agtnan: Monster Shutdown Sequence screenshot 5
Agtnan: Monster Shutdown Sequence screenshot 6
Agtnan: Monster Shutdown Sequence screenshot 7
Agtnan: Monster Shutdown Sequence screenshot 8
Agtnan: Monster Shutdown Sequence screenshot 9

Price history

Accepted price history and recorded lows

Historical lows
All-time low ATL €4.04 2026-07-05
3-month low €4.04
12-month low €4.04
Current €4.49
Price events From the accepted price history
Jul 9, 2026
Sale ended · back to €4.49
Jul 5, 2026
New all-time low €4.04

Agtnan: Monster Shutdown Sequence price history and current deals

Agtnan: Monster Shutdown Sequence for PC currently sells from 4,49 € at authorized stores. Its all-time low is 4,04 €, set on 2026-07-05.

Frequently asked questions

Answered from this game's own price and edition data

How does the current Agtnan: Monster Shutdown Sequence price compare?
The price verdict is wait. The current price is 100% of the way from its all-time low to full price. Seasonal sales have priced it lower.
How does 4,49 € compare with the Agtnan: Monster Shutdown Sequence price history?
4,49 € is 100% of the way from the all-time low of 4,04 € to the full price. A lower price is recorded in the history.
Which stores list Agtnan: Monster Shutdown Sequence?
Agtnan: Monster Shutdown Sequence is tracked at steam. This section lists authorized stores and links to their store pages.
Scores
Steam reviews 1 user reviews · 100%
Media (9)
Tech
Requirements
System requirements platform
Minimum
Minimum:
  • OS *: Windows 8, 10
  • Processor: Dual-core
  • Memory: 4 GB RAM
  • Graphics: DirectX 9 compatible
  • Storage: 700 MB available space
Recommended
Recommended:
  • OS *: Windows 8, 10
  • Processor: Quad-core
  • Memory: 4 GB RAM
  • Graphics: DirectX 9 compatible
  • Storage: 700 MB available space
Facts
EntwicklerAAGH Games, LLC
PublisherAAGH Games, LLC
GenresAction
Links
Altersfreigaben
dejus10
igrs13
steam_germany6
Report an issue with this page